350MW COAL FIRED POWER PLANT, BUILT 2012

Description
We offer a 350 MW subcritical coal-fired power plant, commissioned in 2012 for relocaton with immediate availability.

The plant was commissioned in 2012, realized with state-of-the art environmental controls.

The unit acheives 350MW at up to 38% overall efficiency.

The unit design ensures high reliabilility and high availability of baseload power, providing some flexibility by allowing turndown capability to 40%.

The 350 MW power block is designed to deliver reliable, scalable, and efficient energy production by repurposing the infrastructure of a former coal power plant.

This innovative approach maximizes value from existing assets while supporting the global transition to sustainable energy.
Additional Technical spec.
Turbine Type:
Subcritical steam turbine
Manufacturer: General Electric
Capacity: 350 MW
Generator Type: Synchronous AC generator
Operating Speed: 3000RPM – 50Hz
Speed: 3’000 rpm for 50 Hz applications
Manufacturer: General Electric
Model: D5
Capacity: 370 MW
Stages: 3 stages (HP, IP, LP)
Configuration: Tandem Compound
Steam Parameters:
Inlet pressure: 165 bar(a) (2’393 psi)
Inlet temperature: 565°C (1’050°F)
Exhaust Pressure: 0.05 bar(abs)
Net efficiency38 %

Generator Technical Data:
Type: Synchronous AC generator
Cooling System: Hydrogen-cooled
Output Power: 456 MVA
Power Factor: 0.85
Rotor Speed: 3’000 rpm
Frequency: 50 Hz
Terminal Voltage: 18 kV
Material Insulation Class: F
Operating Temperature Rise Class: B
Efficiency: 99%
UNSPSC26131500 - Power plants
TechnologyCoal
StatusGood
U.M.power plant
Storage Conditiongood
Stock Total Quantity1.00
Lifting meansCrane

WANT TO KNOW MORE ABOUT THIS PRODUCT?

Fill out our contact form, and we'll be delighted to provide you with all the details you need.
We're here to help you make the best choice for your business. Contact us now!

Sending
Sending
Message Sent