350MW COAL FIRED POWER PLANT, BUILT 2012
Description | |
We offer a 350 MW subcritical coal-fired power plant, commissioned in 2012 for relocaton with immediate availability. The plant was commissioned in 2012, realized with state-of-the art environmental controls. The unit acheives 350MW at up to 38% overall efficiency. The unit design ensures high reliabilility and high availability of baseload power, providing some flexibility by allowing turndown capability to 40%. The 350 MW power block is designed to deliver reliable, scalable, and efficient energy production by repurposing the infrastructure of a former coal power plant. This innovative approach maximizes value from existing assets while supporting the global transition to sustainable energy. | |
Additional Technical spec. | |
Turbine Type: Subcritical steam turbine Manufacturer: General Electric Capacity: 350 MW Generator Type: Synchronous AC generator Operating Speed: 3000RPM – 50Hz Speed: 3’000 rpm for 50 Hz applications Manufacturer: General Electric Model: D5 Capacity: 370 MW Stages: 3 stages (HP, IP, LP) Configuration: Tandem Compound Steam Parameters: Inlet pressure: 165 bar(a) (2’393 psi) Inlet temperature: 565°C (1’050°F) Exhaust Pressure: 0.05 bar(abs) Net efficiency38 % Generator Technical Data: Type: Synchronous AC generator Cooling System: Hydrogen-cooled Output Power: 456 MVA Power Factor: 0.85 Rotor Speed: 3’000 rpm Frequency: 50 Hz Terminal Voltage: 18 kV Material Insulation Class: F Operating Temperature Rise Class: B Efficiency: 99% | |
UNSPSC | 26131500 - Power plants |
Technology | Coal |
Status | Good |
U.M. | power plant |
Storage Condition | good |
Stock Total Quantity | 1.00 |
Lifting means | Crane |